A mixed residential development of 545 properties consisting of 4, 5 & 6 storey apartment blocks with undercroft parking, and 3 & 4 storey town houses.

Sovereign Harbour

Construction of the town houses utilises traditional methods with reinforced strip footings supporting load bearing masonry and timber floors. Where external patio areas have been formed at high level, extruded pre-cast concrete planks are used as flooring units.

The apartment buildings have steel superstructure supporting pre-cast concrete planks and are founded on a reinforced concrete transfer slab at first floor level over the undercroft parking areas.

The construction of the Village Centre was an earlier contract consisting of a shop, offices, restaurants and a pub, undertaken on behalf of Sovereign Harbour Limited as a design/build contract with Carillion Building.

The superstructure consists of insitu concrete columns and beams, supporting long span pre-stressed pre-cast floor units with traditional roof trusses supported on steel edge beam spanning between concrete columns. Elevations consist of mixture of fair-faced brickwork, glazing and curtain walling.

Phase 6, which was the first of the current development, consists of 81 properties in a courtyard setting on a site bounded by water on 3 elevations.

Phases 7 — 14 are situated bordering the outer harbour and have, as a focal point, a water feature which has 3 arms, each approximately 100m long x 4m wide x 2m deep at its’ centre. The water surface is broken by horizontal and vertical jets and incorporates underwater lighting.

Click here to print details

Back

South East Office:
The Studio, Morphews Farm, Teston Rd, Offham, Kent ME19 5NE
Telephone: 01732 841812  Facsimile: 01732 841812
EMail: mail@reuby-stagg.co.uk

Head Office:
Dewey House, 55 High Street, Ringwood, Hampshire BH24 1AE
Telephone: 01425 484400  Facsimile: 01425 484409
EMail: admin@reuby-stagg.co.uk

Copyright © 2006 by Reuby & Stagg Ltd. All rights reserved.