90,000 sq.ft mixed hi-tec and industrial development was undertaken for Exton Estates Development Limited on the site of an infilled chalk pit.

Dolphin Point

The chalk pit had been filled to a depth of some 4.5m with excavated clay from numerous sources and left with a steep embankment to two sides and a large highway settlement pond to a third.

Following consideration of a number of ground improvement and foundation techniques, it was decided to adopt the Landpak high energy dynamic consolidation system.

Subsequent dummy foundation tests taken at founding level, consisted of plate bearing tests on a 2 sq.m plate and CBR testing, justified the technique. The steel framed one and two storey buildings were erected using traditional pad foundations and ground bearing slabs. This showed significant savings over the piling solutions originally recommended by the ground investigation.

Click here to print details

Back

South East Office:
The Studio, Morphews Farm, Teston Rd, Offham, Kent ME19 5NE
Telephone: 01732 841812  Facsimile: 01732 841812
EMail: mail@reuby-stagg.co.uk

Head Office:
Dewey House, 55 High Street, Ringwood, Hampshire BH24 1AE
Telephone: 01425 484400  Facsimile: 01425 484409
EMail: admin@reuby-stagg.co.uk

Copyright © 2006 by Reuby & Stagg Ltd. All rights reserved.