SM 7 B & W Staircase

A new production and warehouse facility with associated offices providing a total floor area of 100,000 sq.ft.

SM 6 B & W

To meet the standards of flatness specified by the client and to meet programme constraints, a laser screeded floor was chosen utilising steel fibre reinforcement. Over 1,000 piles were installed to support the superstructure and ground floor. Helical displacement piles were chosen as they give the speed of construction obtained by CFA piles without the associated arisings - an important factor particularly when constructing in contaminated ground.

The steel superstructure consists of a triple span portal with two spans of approximately 36m with an eaves height of 6.5m and a propped span of 50m with an eaves height of 13m. The elevations are of conventional insulated metal cladding with extensive curtain walling to the full height office entrance and reception area.

The site was formerly used as a domestic refuse tip and the design had to incorporate all the problems associated with such material. It was necessary to provide a suspended ground floor both to transmit the loads down to a stable strata and also to provide a void beneath the floor for the venting of methane.

Click here to print details

Back

Kent Office:
Highfield House, 2 West Hill, Dartford, Kent DA1 2EW
Telephone: 01322 221273 Facsimile: 01322 220970
EMail: mail@reuby-stagg.co.uk

Hampshire Office:
Dewey House, 55 High Street, Ringwood, Hampshire BH24 1AE
Telephone: 01425 484400 Facsimile: 01425 484409
EMail: admin@reuby-stagg.co.uk

Copyright © 2006 by Reuby & Stagg Ltd. All rights reserved.